Sign In | Join Free | My hardware-wholesale.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
TORICH INTERNATIONAL LIMITED The Steel Tube Maker
Verified Supplier

11 Years

Home > Heat Exchanger Tubes >

Gr High Pressure Boiler Precision Stainless Steel Tubing

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Gr High Pressure Boiler Precision Stainless Steel Tubing

  • 1
  • 2

Brand Name : Torich

Model Number : ​​GB/T5310

Certification : ISO

Place of Origin : China

MOQ : 5 tons

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 20000 Ton/Tons per Month

Delivery Time : 35-45 days

Packaging Details : Packed in wooden boxes or seaworthy packing.

Product name : ​​GB/T5310 Gr High Pressure Precision Boiler Pipes

Keyword : Precision Seamless Steel Tube

Standard : ​​GB/T5310

Grade : 10# 20# etc Carbon Steel

name : Precision Stainless Steel Tubing

application : Boiler

Contact Now

Gr High Pressure Boiler Precision Stainless Steel Tubing

Product Description:

​GB/T5310 Gr High Pressure Boiler Pipes Precision Seamless Steel Tube​

Standard GB/T5310
Matrial 10# 20# etc Carbon Steel
Size OD: 12.7-177.8mm WT: 1-25.4mm Length: according to customer requirement
Application For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
Production Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
Heat treatment Hot finished tubes need not be heat treated.
Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher
Chemical Composition
C
0.06-0.18
Mn
0.27-0.63
P
≤0.035
S
≤0.035
Si
≤0.25
Mechanical Properties
Brinell Hardness
Rockwell Hardness Number
WT≥0.200 in (5.1mm)
WT≤0.200 in (5.1mm)
137 HRB
77HRB

Mechanical Properties Tests and Inspection

Tensil Streghth: min ksi[Mpa] 47[325] Flattening Test Flaring Test
Yield Point: min ksi[Mpa] 26[180] Flange Test Hardness Test
Elongation: ≥35% Hydrostatic Test

Production Show

Our Company:

Packing & Delivery:

Quality Control​:

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

GB/T5310 Gr High Pressure Boiler Pipes Precision Seamless Steel Tube


















Product Tags:

Boiler Precision Stainless Steel Tubing

      

​​GB/T5310 Precision Stainless Steel Tubing

      
China Gr High Pressure Boiler Precision Stainless Steel Tubing wholesale

Gr High Pressure Boiler Precision Stainless Steel Tubing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)